Mastering Studio

Mastering studio built with Belgian architect Thomas Jouanjean : http://www.northwardacoustics.com/

2nd Layer of roof framing complete

2nd Layer of roof framing complete

Intricate three layer ceiling framing for holding staggered layers of insulation with ascending density profiles.

Intricate three layer ceiling framing for holding staggered layers of insulation with ascending density profiles.

Ceiling structure and insulation complete. Light/HVAC install complete. Sprinkler system complete.

Ceiling structure and insulation complete. Light/HVAC install complete. Sprinkler system complete.

Channels for cables set in floating concrete floor

Channels for cables set in floating concrete floor

IMG_8618.jpg
Concrete floor poured on steel pan forms which are mechanically detached from building with steel shims on pink sylomer foam resting on concrete curbs. This helps reduce outside vibrations.

Concrete floor poured on steel pan forms which are mechanically detached from building with steel shims on pink sylomer foam resting on concrete curbs. This helps reduce outside vibrations.

Adam Gonzalves of Telegraph Mastering at work in the new studio 9 months later.

Adam Gonzalves of Telegraph Mastering at work in the new studio 9 months later.

Front wall complete, ready for speaker mounting by Northward.

Front wall complete, ready for speaker mounting by Northward.

3 foot thick back wall complete

3 foot thick back wall complete